Summary.
Excavator and Drains:
Page 1.
$9,188.75
Bricklayer and Mason,
8.
80,389.42
Carpenter and Joiner,
4.
8,280.24
Plumber.
4.
850.90
Smith and Founder,
5.
4,608.76
Glazier.
5.
38.25
Painter.
5.
828.98
Estimated cost of Tower:
Pier:
Total
$
97,732.4
4,835.11
102,567.51
becomes
Summary.
Excavator and Drains:
Page 1.
$9,188.75
Bricklayer and Mason,
8.
80,389.42
Carpenter and Joiner,
4.
8,280.24
Plumber.
4.
850.90
Smith and Founder,
5.
4,608.76
Glazier.
5.
38.25
Painter.
5.
828.98
Estimated cost of Tower: $ 97,732.4 Pier: 4,835.11 Total 102,567.51 is not needed, simple paragraph is fine. The final output isSummary.
Excavator and Drains:
Page 1.
$9,188.75
Bricklayer and Mason,
8.
80,389.42
Carpenter and Joiner,
4.
8,280.24
Plumber.
4.
850.90
Smith and Founder,
5.
4,608.76
Glazier.
5.
38.25
Painter.
5.
828.98
Estimated cost of Tower: $ 97,732.4
Pier: 4,835.11
Total 102,567.51
However to follow instruction to the letterSummary.
Excavator and Drains:
Page 1.
$9,188.75
Bricklayer and Mason,
8.
80,389.42
Carpenter and Joiner,
4.
8,280.24
Plumber.
4.
850.90
Smith and Founder,
5.
4,608.76
Glazier.
5.
38.25
Painter.
5.
828.98
Estimated cost of Tower: $97,732.4
Pier: 4,835.11
Total 102,567.51
COPY
Sunnary.'
Excavator: and Drains; :
page 1.
$9,188) 75
Bricklayer: and Kason,›
8.
80,389 42
Garpenter and Joiner,
4'.
8,280 24
Plumber.:
4'.
850 90
Smith and Founder,"
5.
4,608 76
Glazier.
5..
8** 25
Painter:
5.
828 98
Estimated cost: of Tower:
do. do. Beat: over:
$
Pier:
Total
"O
97.732
4,835 #1
#108,887 51